Wednesday, December 20, 2006

Electrical validation of Accelerator Cavity – 25 August 2006

This day we went to Eindhoven University of Technology to perform electrical measurements on the accelerator cavity after the final turning. The measurements are summarized in the following report: ElectricalValidationCavity.pdf

Resonance frequency measured by Network Analyzer.

Beat ball measurement setup to measure the on-axis electric field strength.

No comments: